Continuing the count to 52 weeks of pretty things in and around my house ... to get every week covered so far, I should be at 9. Given that I missed 2 weeks in January and have been in phase 1 of labor (don't ever call it "false" labor because there's nothing fake about it) for most of February, I'm kind of surprised that I got much of anything done this month. But I did! Go me! And I have a couple more projects started that aren't done yet, even!
Project 4: Adam and I rearranged the pictures and everything on the walls all over the house. We took some pictures down awhile back because we shifted some furniture and never got around to putting them back up. That's done now including with updated photos (that are still almost a year old, which tells you how old the other pictures were).
Project 5: I make a new flannel swaddling blanket for each of my babies, and it's what they come home from the hospital in. Baby JK was showing signs of an early arrival (and all labor indicators flat-lined this week, so she's still not here) so I got going on her blanket. I had it halfway done when JE took a chunk out of the side with the scissors (my mom refers to her as a "busy" 2-year-old - yeeeeah, that's a good word for it.) Fortunately, it was the side and not out of the middle. Unfortunately, it was a side that was already done. So I had to trim that edge down to get rid of the cut and do it again. Done, packed in the hospital bag, and scissors put away.
Project 6: When clearing out some drawers to use for the new baby's clothes, I put down scrapbook paper as a drawer liner. I just taped it instead of using glue so I can switch it out when I get my drawers back. Cutsey pink is great for a baby but I prefer something different for myself.
Project 7: Miniature corkboards on the "school wall" in our entry for the girls to hang up their art. I saw this on a homeschool blog but didn't bookmark it. Oops. Sorry, person who should get credit but won't. You get random picture frames, take out the picture and glass, sand and paint them in whatever colors you want, and put corkboard in them. The original link used really bright colors, which I liked. I've kinda/sorta decided that our colors for homeschooling are green and yellow, so those were the 2 colors I used, and I put them up with a pink board that SM built at a Home Depot kids workshop. I also put one in my sewing corner (painted to match my spool board) to display my collectors pins that I used to get while traveling and have been sitting in a box for forever. I gave the girls my Disney pins for their boards and some others from places they've been. I kept my Australia pins and some that have more sentimental value to me.
Project 8: I wanted some kind of sewing hand-work to do while sitting in the hospital for 2 days, so enter this month's Christmas project - fabric gift tags. I used this site to look up embroidery stitches, and still seem to have kind of come up with my own version of a chain stitch. Go figure. This is not done at all - I'm making about a dozen of them, and have the stitching done on 4. It's a decent start, considering everything that's been happening lately. I'll finish all the stitching and then do all the backings at the same time.
I also cut out skirts to make for the girls but haven't sewn them together yet. My March Christmas project will be from the scraps of the corkboard after cutting it down to fit the 8x10 frames. The March priority is definitely Easter dresses for the girls, since Easter is on the 31st.
1 comment:
I am impressed! I hope 'phase one' of labor doesn't last too much longer. Good luck!
Post a Comment