- the doll quilt project was finished up with the last of the labels being attached, and shipped out to Wisconsin.
- JE's birthday dress
- a pair of knit shorts for pajamas. The Kid Shorts pattern from Made only goes up to a size 10, and three of my five have outgrown that largest size in the past few months. So I attempted to scale it up to a 12-ish size, and this was my test run. I need to make a slight adjustment on the height of the rise to the waistband, but mostly it turned out fine.
- I gave myself a deadline to finish the Night Sky quilt: SM's birthday in 8 days. I made 7 more blocks and got the second section of three done. I was trying to entirely finish the pieced top today, but got sidetracked by an emergency visit to the orthodontist. It will be done by this weekend, and then I'll have Mon/Tues/Wed next week to quilt it. The binding will be easy - the backing is HUGE because I bought super-wide flannel (120 inches instead of 60), so I'm going to flip it around to the front and enclose the edges with it.
Showing posts with label service. Show all posts
Showing posts with label service. Show all posts
30 April 2019
22 April 2019
service finish
31 March 2019
March notes
1 - A Doll Like Me doll quilts: I quilted the 7 I had pinned, pinned the other 6, and quilted all of them. In three days. I was on a roll. I took them to a friend who showed me how to do binding. While she did 12, I did one. In the same amount of time. Yeah. I'm a rookie and she's super experienced.
I am now handstitching on the "Made by kids for kids" labels. 4 done, 9 to go.
2 - Night Sky blocks: 2 more.
3 - six bean bags for hopscotch
4 - "thread drawing" on a skirt to "decorate" it for my I-hate-plain-clothes girls.
5 - costume pieces for JK's birthday party: no-sew fleece dragon wings for JK and TA, a big stuffed dragon tail for JK, and a glittery top with a high-low hem for JE. I used the Girl-on-the-Go pattern from Oliver+S for the top.
I am now handstitching on the "Made by kids for kids" labels. 4 done, 9 to go.
2 - Night Sky blocks: 2 more.
3 - six bean bags for hopscotch
4 - "thread drawing" on a skirt to "decorate" it for my I-hate-plain-clothes girls.
5 - costume pieces for JK's birthday party: no-sew fleece dragon wings for JK and TA, a big stuffed dragon tail for JK, and a glittery top with a high-low hem for JE. I used the Girl-on-the-Go pattern from Oliver+S for the top.
JK's dragon wings and tail. I didn't get a picture of TA's wings, but they were the same scallops only in orange. They were dragons from Dragons Love Tacos, and we had tacos at the party.
Vega from Star Darlings. The costumes were to dress as your favorite book character.
6 - Mending: 5
28 February 2019
February's list
Quilting
1 - Squared Away: the last 4 blocks are DONE!! Hooray! I did the final two sets - dark green and purple, and got everything boxed up and into the mail for Mindy. I was apparently so excited to get them done and out the door, I didn't even take pictures of the last block. Ha! I just got her last two blocks a couple of days ago, so as soon as I get the doll quilts done and on their way, I can lay out this quilt and start putting the full top together. Hooray!
2 - Night Sky: 5 more blocks made, and section 2 of the quilt put together. So the entire top section is now done, and it's 60 inches across. The plan is to make it 80 inches long - right now, it's at 33. I was running out of the gray in the top center spinner, so in the bottom left Hunter Star, I used the gray scraps from SM's apron from last year's theater costume. It will be fun for her to have that memory incorporated into her quilt.
3 - Letter blocks: one so far, for a new mini quilt project. I got this quilting book called Spelling Bee by Lori Holt and it literally is the instructions to make every letter of the alphabet, both upper and lower case, plus a bunch of punctuation marks and some fun extra bonus blocks. The globe was the one that got me to buy the book. I have so. many. ideas. of what to do with the letters.
4 - 15 doll quilts to be sent to A Doll Like Me: the two TA and I made a year ago, the star one that JE started in January, AND 12 more made this month by our church activity group. My part of the 13 made in the past 60 days:
Another woman from church, who donated some of the fabric, has agreed to do the bindings. Bless her forever!
Other sewing
1 - two more scripture tote bags ... I made the ten in January for the church activity girls and had a little fabric left over. So I made two more for my girls who didn't have bags for church items. For our family, the "quiet" materials are sketchbooks and writing utensils (pens, pencils, markers, etc).
2 - more service sewing, this time for Days For Girls. My church's women's organization is part of an interfaith group that makes fabric reusable menstruation products to be taken to developing countries, where the women and girls don't have hygiene items during their cycles. The original intention was to give girls these products so they don't have to miss school during their period, but I'm sure it's spread further than that. Our local group is getting a shipment ready to send to Senegal this spring and I went to a Saturday sewing day this month. I have a schedule conflict for the Saturday in March, so I brought home 25 shields to finish here, and a friend will take them back. They're done and ready to go.
SM goes with me - she and her friend JM put snaps on one of the pieces, and they're knocking out quite a few service hours!
Mending: 8
1 - Squared Away: the last 4 blocks are DONE!! Hooray! I did the final two sets - dark green and purple, and got everything boxed up and into the mail for Mindy. I was apparently so excited to get them done and out the door, I didn't even take pictures of the last block. Ha! I just got her last two blocks a couple of days ago, so as soon as I get the doll quilts done and on their way, I can lay out this quilt and start putting the full top together. Hooray!
2 - Night Sky: 5 more blocks made, and section 2 of the quilt put together. So the entire top section is now done, and it's 60 inches across. The plan is to make it 80 inches long - right now, it's at 33. I was running out of the gray in the top center spinner, so in the bottom left Hunter Star, I used the gray scraps from SM's apron from last year's theater costume. It will be fun for her to have that memory incorporated into her quilt.
3 - Letter blocks: one so far, for a new mini quilt project. I got this quilting book called Spelling Bee by Lori Holt and it literally is the instructions to make every letter of the alphabet, both upper and lower case, plus a bunch of punctuation marks and some fun extra bonus blocks. The globe was the one that got me to buy the book. I have so. many. ideas. of what to do with the letters.
4 - 15 doll quilts to be sent to A Doll Like Me: the two TA and I made a year ago, the star one that JE started in January, AND 12 more made this month by our church activity group. My part of the 13 made in the past 60 days:
- organized all the adults for the evening activity, plus some other adults helped with the fabric
- cut 230 squares, other people brought more and we had probably around 1000
- made the "Made by kids for kids" labels
- after the activity, I finished 4 of the quilts at home
- made 7 quilt sandwiches, 6 to go but I ran out of pins
Another woman from church, who donated some of the fabric, has agreed to do the bindings. Bless her forever!
Other sewing
1 - two more scripture tote bags ... I made the ten in January for the church activity girls and had a little fabric left over. So I made two more for my girls who didn't have bags for church items. For our family, the "quiet" materials are sketchbooks and writing utensils (pens, pencils, markers, etc).
2 - more service sewing, this time for Days For Girls. My church's women's organization is part of an interfaith group that makes fabric reusable menstruation products to be taken to developing countries, where the women and girls don't have hygiene items during their cycles. The original intention was to give girls these products so they don't have to miss school during their period, but I'm sure it's spread further than that. Our local group is getting a shipment ready to send to Senegal this spring and I went to a Saturday sewing day this month. I have a schedule conflict for the Saturday in March, so I brought home 25 shields to finish here, and a friend will take them back. They're done and ready to go.
SM goes with me - she and her friend JM put snaps on one of the pieces, and they're knocking out quite a few service hours!
Mending: 8
what we're talking about:
accessories,
bags,
children,
quilting,
review,
service,
Squared Away 2018,
toys
16 February 2019
A Doll Like Me take 2
Last February - a year ago - there was a sewing challenge from the blog Needle and Foot to make doll quilts for A Doll Like Me, a single-woman shop that custom-makes dolls to match children's limb differences. I set a target for our family to have everyone make one - six or seven (depending on Adam) ... which we did not meet. TA and I were the only ones who made any, and those two lonely little quilts have just been sitting here ever since.
But those two little quilts - staring at my kids for almost a year - have certainly raised awareness in our house. Recently, JE needed to do a service activity for her church award program, so her star blocks last month were the start of a new doll quilt to donate. I need to block in the background fabrics for her, since that's even a bit out of my own range, but she was excited about making the star blocks.
Status: in progress.
Then it was JE's turn to choose the church activity for a Wednesday evening - she wanted to sew doll quilts to donate. So proud of my girl for choosing service instead of just playing games!
We had five adults to manage the ten girls, plus a 5-year-old little sister who was tagging along with Mom, at our evening activity - two per sewing machine. All the girls chose their fabrics and how they were laid out, and got to take turns sewing on the machines.
We labeled them "Made by kids for kids" and they really were. My own daughter, TA, was working with me at my machine, and she and her partner KA charged right in there. If I even looked away, one of them would be right there at the machine. They did not need help, thankyouverymuch! At one point, I walked away entirely to check on some other kids and my work buddies had two rows done by the time I got back.
Status: 9 flimsies done, 3 more with the squares in rows but the rows need to be attached because we ran out of time. So a total of 12 from the church activity, because when our 5-year-old little sister heard that her friend got to make one, she wanted to do one too. So we did. The three from home (2 done last year, JE's stars) make a total of 15 to be shipped when we're done.
Next: I brought everything home to square them. Some got a bit wonky, and one had to have the last row taken completely off and redone. I need to figure out batting - I thought I had some fleece I could use, but it's not going to work out. Then I'll pin them into their 3-layer sandwiches and do just basic straight-line quilting. Another woman from church said that she'll do all the bindings for me - hooray!
But those two little quilts - staring at my kids for almost a year - have certainly raised awareness in our house. Recently, JE needed to do a service activity for her church award program, so her star blocks last month were the start of a new doll quilt to donate. I need to block in the background fabrics for her, since that's even a bit out of my own range, but she was excited about making the star blocks.
Status: in progress.
Then it was JE's turn to choose the church activity for a Wednesday evening - she wanted to sew doll quilts to donate. So proud of my girl for choosing service instead of just playing games!
We had five adults to manage the ten girls, plus a 5-year-old little sister who was tagging along with Mom, at our evening activity - two per sewing machine. All the girls chose their fabrics and how they were laid out, and got to take turns sewing on the machines.
We labeled them "Made by kids for kids" and they really were. My own daughter, TA, was working with me at my machine, and she and her partner KA charged right in there. If I even looked away, one of them would be right there at the machine. They did not need help, thankyouverymuch! At one point, I walked away entirely to check on some other kids and my work buddies had two rows done by the time I got back.
Status: 9 flimsies done, 3 more with the squares in rows but the rows need to be attached because we ran out of time. So a total of 12 from the church activity, because when our 5-year-old little sister heard that her friend got to make one, she wanted to do one too. So we did. The three from home (2 done last year, JE's stars) make a total of 15 to be shipped when we're done.
Next: I brought everything home to square them. Some got a bit wonky, and one had to have the last row taken completely off and redone. I need to figure out batting - I thought I had some fleece I could use, but it's not going to work out. Then I'll pin them into their 3-layer sandwiches and do just basic straight-line quilting. Another woman from church said that she'll do all the bindings for me - hooray!
01 February 2019
January in Connecticut
I'm finally sewing a lot again! Hooray! I missed it. Now I need to get back into blogging too, so things get their own posts throughout the month instead of a big photo dump at intervals.
Clothing
1 - circle skirt for SM - I watched the video from Made Everyday and used her instructions. It was pretty intimidating at first because of the curve, and sewing directly to the elastic. And ... yeah, don't look too closely at that part. Good thing her shirt covers the top! But it's sufficiently twirly for her, so she's happy.
2 - peasant top for RG - tutorial from Things of Cloth. It's the same pattern that SM is wearing in the above picture, that I made last spring (yep, these are two different shirts in the pictures!). Now RG has one as well, but she's worn it only the one time. ???? Maybe because she has deemed it a spring shirt? Or maybe it will end up in SM's drawer. The peasant top I made for SM last year has been worn SO much that it's becoming very, very thin.
Quilts
8 blocks for 3 different quilts ... 4 for Squared Away - I'm FINALLY getting back to it! Just two more colors left - dark green and dark purple.
JE and TA wanted to try their hand at machine sewing, and they worked with me on 2 blocks each. I did all the cutting (I don't trust kids yet with the rotary cutter - I gashed my own finger with it a few months ago), and I helped them with the machine. JE learned chain-stitching, which she thought was nifty.
JE made two of these star blocks with her own selection of fabric, to be put into a doll quilt. She did the chain piecing for all the half-square-triangles (HST), and was excited to put them all together into one star.
TA has plans for her own twin-sized quilt for her bed, which obviously I've not made yet ... happy to have her assistance! She did two blocks as well. We're using the house block pattern from Intrepid Thread.
Crafting
1 - Ten canvas tote bags for a church activity. The 10 girls in my group decorated them with fabric markers, and hot-gluing ribbon and fabric flowers and "jewel" sparkle thingies to them. Yes, I could have bought them. But buying 10 would have cost $45, and the fabric cost only $15. I had the time to make them, and I have other ideas for blowing my budget money this year.
2 - While I had the craft supplies out, JK found some leftover fabric circle flower things kicking around, and decided one needed to be a hair clip. Sure, why not!
3. Edge stitching on a large piece of fleece to make into a throw blanket for the TV couch.
Mending: 5
Clothing
1 - circle skirt for SM - I watched the video from Made Everyday and used her instructions. It was pretty intimidating at first because of the curve, and sewing directly to the elastic. And ... yeah, don't look too closely at that part. Good thing her shirt covers the top! But it's sufficiently twirly for her, so she's happy.
2 - peasant top for RG - tutorial from Things of Cloth. It's the same pattern that SM is wearing in the above picture, that I made last spring (yep, these are two different shirts in the pictures!). Now RG has one as well, but she's worn it only the one time. ???? Maybe because she has deemed it a spring shirt? Or maybe it will end up in SM's drawer. The peasant top I made for SM last year has been worn SO much that it's becoming very, very thin.
Quilts
8 blocks for 3 different quilts ... 4 for Squared Away - I'm FINALLY getting back to it! Just two more colors left - dark green and dark purple.
JE and TA wanted to try their hand at machine sewing, and they worked with me on 2 blocks each. I did all the cutting (I don't trust kids yet with the rotary cutter - I gashed my own finger with it a few months ago), and I helped them with the machine. JE learned chain-stitching, which she thought was nifty.
JE made two of these star blocks with her own selection of fabric, to be put into a doll quilt. She did the chain piecing for all the half-square-triangles (HST), and was excited to put them all together into one star.
TA has plans for her own twin-sized quilt for her bed, which obviously I've not made yet ... happy to have her assistance! She did two blocks as well. We're using the house block pattern from Intrepid Thread.
Crafting
1 - Ten canvas tote bags for a church activity. The 10 girls in my group decorated them with fabric markers, and hot-gluing ribbon and fabric flowers and "jewel" sparkle thingies to them. Yes, I could have bought them. But buying 10 would have cost $45, and the fabric cost only $15. I had the time to make them, and I have other ideas for blowing my budget money this year.
2 - While I had the craft supplies out, JK found some leftover fabric circle flower things kicking around, and decided one needed to be a hair clip. Sure, why not!
3. Edge stitching on a large piece of fleece to make into a throw blanket for the TV couch.
Mending: 5
what we're talking about:
accessories,
clothes,
quilting,
review,
service,
Squared Away 2018
30 April 2018
April journal
Aren't I so great with post titles? Ha ha!
SEWING
Major progress on my Alphabet Challenge! I got U, V, and W done just this month! It helped that they were small projects ... X is in process. Y has the fabric washed and ready, just need to trace off the pattern. Z is going to be EPIC. Definitely planning to end this challenge with a bang!
1. U: JE's pillow that matches her quilt.
2. V: Finished my contribution to the doll quilts for A Doll Like Me - the top was complete in March, but I still had to quilt and bind it. All done now. I'll give us a little more time to work on the doll quilts from the girls, but if they're not done by the end of the summer, I'm calling it good and sending what we have.
3. W: JE's white baptism dress.
4. Night Sky quilt: I made a couple of these blocks, called Clay's Choice from 1920. I think it's cool to make old-time blocks, and learn their names. I had planned to do more, but I got sidetracked with making plans for summer clothes for the girls. My new target with this quilt starting in May is one block per week. Otherwise, it's never going to get done.
5. DC map quilt: just a few stitches here and there, but that means I'm a few stitches closer every time I pick up the needle! I have it set out in my bedroom where it's accessible to me, but the kids aren't going to mess it up. I have the entire bottom "row" almost done.
6. English paper piecing (EPP): yet another WIP started! A couple of years ago, I was visiting my bestie Sarah in Utah who was working on EPP at the time. She showed me how to do it and gave me a couple of samples, and they've just been sitting here waiting for me to figure something out with them. Recently, I saw this tote bag online and I. Want. It. My EPP is diamonds, not hexagons, so it will look different ... but the concept will be the same, all the way down to the grommets. I can't buy her pattern because of the money exchange - this a blog in Ireland ... but I've figured out enough about bags by now that I think I can do this one on my own with just the photo for inspiration.
7. Flannel rice bags: we've had some aches and pains this month, and some fussing for a rice bag as a heating pad. We had an old sock filled with rice and tied off with a rubber band, but ... yuck. So in literally 5 minutes, I grabbed a flannel scrap, sewed it around 3 sides, filled it with rice, and then sewed it shut. Bam. Done. I did this twice, including with boy flannel for Adam to have one for himself. We don't need everything pink or floral-printed around here.
8. I attempted to participate in Kid Clothes Week, which is a challenge to sew for one hour every day for a week. I sewed for an hour and 45 minutes ONE day. That's all. But I got a pair of shorts and a quickie nightgown done! They were made from fleece pillowcases, from a sheet set that wore out.
THE HOUSE
We've had an antique cabinet grand piano for a few years that we got for free when an elderly person from our church passed away and their house was being emptied out. We figured out that it was built in 1905, and we tried to get it tuned. That ended up killing it. Adam asked around with piano tuners and shops: we could have a $20,000 restored piano ... after we spent at least half that getting all the pegs, strings and keys replaced ... so Adam decided to turn it into a desk. In about 3 days, he pulled it apart, cleaned the pieces he decided to keep, and put it back together ... ta da! We have an antique cabinet grand desk!
So far this year, the house projects have all been Adam's. Sigh.
SEWING
Major progress on my Alphabet Challenge! I got U, V, and W done just this month! It helped that they were small projects ... X is in process. Y has the fabric washed and ready, just need to trace off the pattern. Z is going to be EPIC. Definitely planning to end this challenge with a bang!
1. U: JE's pillow that matches her quilt.
2. V: Finished my contribution to the doll quilts for A Doll Like Me - the top was complete in March, but I still had to quilt and bind it. All done now. I'll give us a little more time to work on the doll quilts from the girls, but if they're not done by the end of the summer, I'm calling it good and sending what we have.
3. W: JE's white baptism dress.
4. Night Sky quilt: I made a couple of these blocks, called Clay's Choice from 1920. I think it's cool to make old-time blocks, and learn their names. I had planned to do more, but I got sidetracked with making plans for summer clothes for the girls. My new target with this quilt starting in May is one block per week. Otherwise, it's never going to get done.
5. DC map quilt: just a few stitches here and there, but that means I'm a few stitches closer every time I pick up the needle! I have it set out in my bedroom where it's accessible to me, but the kids aren't going to mess it up. I have the entire bottom "row" almost done.
6. English paper piecing (EPP): yet another WIP started! A couple of years ago, I was visiting my bestie Sarah in Utah who was working on EPP at the time. She showed me how to do it and gave me a couple of samples, and they've just been sitting here waiting for me to figure something out with them. Recently, I saw this tote bag online and I. Want. It. My EPP is diamonds, not hexagons, so it will look different ... but the concept will be the same, all the way down to the grommets. I can't buy her pattern because of the money exchange - this a blog in Ireland ... but I've figured out enough about bags by now that I think I can do this one on my own with just the photo for inspiration.
7. Flannel rice bags: we've had some aches and pains this month, and some fussing for a rice bag as a heating pad. We had an old sock filled with rice and tied off with a rubber band, but ... yuck. So in literally 5 minutes, I grabbed a flannel scrap, sewed it around 3 sides, filled it with rice, and then sewed it shut. Bam. Done. I did this twice, including with boy flannel for Adam to have one for himself. We don't need everything pink or floral-printed around here.
8. I attempted to participate in Kid Clothes Week, which is a challenge to sew for one hour every day for a week. I sewed for an hour and 45 minutes ONE day. That's all. But I got a pair of shorts and a quickie nightgown done! They were made from fleece pillowcases, from a sheet set that wore out.
THE HOUSE
We've had an antique cabinet grand piano for a few years that we got for free when an elderly person from our church passed away and their house was being emptied out. We figured out that it was built in 1905, and we tried to get it tuned. That ended up killing it. Adam asked around with piano tuners and shops: we could have a $20,000 restored piano ... after we spent at least half that getting all the pegs, strings and keys replaced ... so Adam decided to turn it into a desk. In about 3 days, he pulled it apart, cleaned the pieces he decided to keep, and put it back together ... ta da! We have an antique cabinet grand desk!
So far this year, the house projects have all been Adam's. Sigh.
08 April 2018
V is for Valentine
We went a little crazy with Valentine's Day this year. We made:
- hearts out of plastic canvas and yarn. We ended up with more than 20 of these, and we looped ribbon and hung them up in windows. TA and JK kept saying they wanted to "knit" and I had to keep correcting them to "sew" or "embroider." They had found some random sheets of plastic canvas that have been kicking around for forever, and I cut every last bit of it into hearts. It was a lot of handstitching. My little girls thought it was awesome.
- cards with cardstock, foam stickers from Target, and ink/stamps. We didn't mail any out this year, just made them for each other.
- envelopes to hold all those cards along with some treats. I trimmed the tabs off manila folders and closed the sides with packing tape. Easy. Even SM, a big middle schooler now, loves our family Valentine party every year.
- "suncatchers" (although obviously without the SUN) with contact paper, tissue paper, and a Sharpie.
I'm in a bit of a craft-like-crazy mode this year, just to clear out a lot of old supplies that have been sitting around for forever. This was helpful with the plastic canvas and the contact paper.
And even though we moved into March and now April, I was still in heart mode when I made my little quilt for A Doll Like Me. I was trying to get it done for Project Quilting, but I got just the top done. Finally did some light quilting and the binding today. I outlined the hearts with stitch-in-the-ditch to make them stand out more, and then the loops down the side. I didn't want it too dense because I'm learning that dense quilting makes things stiff. This is for a child so it needs to be soft. The back is the same flannel that I used on the doll quilt TA made.
- hearts out of plastic canvas and yarn. We ended up with more than 20 of these, and we looped ribbon and hung them up in windows. TA and JK kept saying they wanted to "knit" and I had to keep correcting them to "sew" or "embroider." They had found some random sheets of plastic canvas that have been kicking around for forever, and I cut every last bit of it into hearts. It was a lot of handstitching. My little girls thought it was awesome.
- cards with cardstock, foam stickers from Target, and ink/stamps. We didn't mail any out this year, just made them for each other.
- envelopes to hold all those cards along with some treats. I trimmed the tabs off manila folders and closed the sides with packing tape. Easy. Even SM, a big middle schooler now, loves our family Valentine party every year.
- "suncatchers" (although obviously without the SUN) with contact paper, tissue paper, and a Sharpie.
I'm in a bit of a craft-like-crazy mode this year, just to clear out a lot of old supplies that have been sitting around for forever. This was helpful with the plastic canvas and the contact paper.
And even though we moved into March and now April, I was still in heart mode when I made my little quilt for A Doll Like Me. I was trying to get it done for Project Quilting, but I got just the top done. Finally did some light quilting and the binding today. I outlined the hearts with stitch-in-the-ditch to make them stand out more, and then the loops down the side. I didn't want it too dense because I'm learning that dense quilting makes things stiff. This is for a child so it needs to be soft. The back is the same flannel that I used on the doll quilt TA made.
what we're talking about:
children,
crafts,
holidays,
home decorating,
service,
Sew All 26 challenge,
toys
31 March 2018
March journal
Very few photos here, because these things are either already in their own posts, or will get them when they're all the way finished ... here we go again for my monthly review.
SEWING
1. I bought new curtains for my bedroom from Ikea and they were WAY too long. I cut them almost in half to get the length where I wanted it, so now I have that extra fabric for the other small window and probably the bathroom. It almost seems like cheating to BUY curtains instead of making them from scratch, but hello - cheap Ikea fabric! The windows don't get to wear expensive fabric, my kids and I do.
2. SM's theater costume - I finished the peasant top in Feb, the skirt and apron this month. I also did an alteration job on a skirt for a friend, which took a lot longer than I thought it would.
Less than an hour after I finished SM's apron, I was cutting fabric for more zip bags because I never finished the batch on the list from right after Christmas. JK wants her treasure bag! And I sliced my index finger with my rotary blade ... so that ended all sewing for over a week, which was especially irritating because I was motivated to keep sewing! Who knows what I would have finished that day if I hadn't gashed my finger! It's still not fully healed but I could at least get back to work finally before the end of the month.
3. Doll quilt - Back to work with my own contribution for A Doll Like Me, which was going to be submitted to Project Quilting 9.6 as a scrap project ... but I ran out of time for that. I did get the pieced top entirely done but it still needs to be quilted and bound. This is where it sits now. It will have pink binding, which is also a leftover scrap! And I'm apparently cleaning out the baby-print flannel on the doll quilt project, because I haven't sewn anything for a baby for a really long time.
And I still need to get 4 more daughters to work on theirs. This is apparently an extremely long-term service project - I'm glad that ADLM has all the other contributions from the quilt drive to distribute first.
4. I made 2 more zip bags for gifts that will be given to their recipient tomorrow. Up to 11 now, and poor TA and JK still haven't gotten their's. If it weren't for that darn finger injury!! SM wants another one for summer camp, I want one for summer camp (I'm going with SM as a leader), and I'll probably make more at Christmas for the next bunch of school teachers. But those can wait awhile.
5. I worked on my DC map embroidered quilt off and on because I hauled it to two different book clubs and when I was chaperoning backstage during SM's play performance.
THE HOUSE
We needed to rearrange some curtain rods between the living room and one of the bedrooms, and FINALLY got that done. We took down the metal slatted blinds in the last bedroom when we put up the curtains, because I hate those blinds. (Too many years in apartments.) There is now only one set in my house, and they're in the basement next to the furnace. So we'll leave them. But the rest are GONE!!! Hooray!!!
Adam got another set of doors up on the kitchen cabinets, but doesn't like how they line up together, so he's probably going to take it all down and do it again. Where's the eye roll on Blogger ... just get the doors up!!! He keeps saying that he "sees every flaw." I'm really not sure what level of perfection he's going here but if he doesn't let some of those flaws go, we're going to die before the kitchen is done.
One of the garage doors has been sticking and not working properly. Conveniently, a former neighbor gave us a brand new door opener motor and pulley system, still in the box, when they moved 3 years ago. It's just been sitting there all this time, so Adam spent a Saturday swapping out the door opener system. (And it's one less thing taking up space! Yay!)
SEWING
1. I bought new curtains for my bedroom from Ikea and they were WAY too long. I cut them almost in half to get the length where I wanted it, so now I have that extra fabric for the other small window and probably the bathroom. It almost seems like cheating to BUY curtains instead of making them from scratch, but hello - cheap Ikea fabric! The windows don't get to wear expensive fabric, my kids and I do.
2. SM's theater costume - I finished the peasant top in Feb, the skirt and apron this month. I also did an alteration job on a skirt for a friend, which took a lot longer than I thought it would.
Less than an hour after I finished SM's apron, I was cutting fabric for more zip bags because I never finished the batch on the list from right after Christmas. JK wants her treasure bag! And I sliced my index finger with my rotary blade ... so that ended all sewing for over a week, which was especially irritating because I was motivated to keep sewing! Who knows what I would have finished that day if I hadn't gashed my finger! It's still not fully healed but I could at least get back to work finally before the end of the month.
3. Doll quilt - Back to work with my own contribution for A Doll Like Me, which was going to be submitted to Project Quilting 9.6 as a scrap project ... but I ran out of time for that. I did get the pieced top entirely done but it still needs to be quilted and bound. This is where it sits now. It will have pink binding, which is also a leftover scrap! And I'm apparently cleaning out the baby-print flannel on the doll quilt project, because I haven't sewn anything for a baby for a really long time.
And I still need to get 4 more daughters to work on theirs. This is apparently an extremely long-term service project - I'm glad that ADLM has all the other contributions from the quilt drive to distribute first.
4. I made 2 more zip bags for gifts that will be given to their recipient tomorrow. Up to 11 now, and poor TA and JK still haven't gotten their's. If it weren't for that darn finger injury!! SM wants another one for summer camp, I want one for summer camp (I'm going with SM as a leader), and I'll probably make more at Christmas for the next bunch of school teachers. But those can wait awhile.
5. I worked on my DC map embroidered quilt off and on because I hauled it to two different book clubs and when I was chaperoning backstage during SM's play performance.
THE HOUSE
We needed to rearrange some curtain rods between the living room and one of the bedrooms, and FINALLY got that done. We took down the metal slatted blinds in the last bedroom when we put up the curtains, because I hate those blinds. (Too many years in apartments.) There is now only one set in my house, and they're in the basement next to the furnace. So we'll leave them. But the rest are GONE!!! Hooray!!!
Adam got another set of doors up on the kitchen cabinets, but doesn't like how they line up together, so he's probably going to take it all down and do it again. Where's the eye roll on Blogger ... just get the doors up!!! He keeps saying that he "sees every flaw." I'm really not sure what level of perfection he's going here but if he doesn't let some of those flaws go, we're going to die before the kitchen is done.
One of the garage doors has been sticking and not working properly. Conveniently, a former neighbor gave us a brand new door opener motor and pulley system, still in the box, when they moved 3 years ago. It's just been sitting there all this time, so Adam spent a Saturday swapping out the door opener system. (And it's one less thing taking up space! Yay!)
what we're talking about:
accessories,
children,
clothes,
handmade,
home decorating,
quilting,
renovation,
review,
service,
sewing
28 February 2018
February journal
1. Squared Away block of the month: 4 blocks. I finished two more blocks for light blue-January that had already been started. I did just two purple blocks for February, and Mindy and I will each get one of them. So Mindy and I each have a set of blocks that looks like this, so far:
2. Valentine's hearts in plastic canvas and yarn: my little girls wanted Valentine's decorations, and one of them found a few random sheets of plastic canvas that have been kicking around for forever. No more. It's all been cut into hearts, and yarn or ribbon looped through them to hang in the windows. TA and JK took turns stitching and we made a bunch of them. JK keeps calling it "knitting" and I keep correcting her to "embroidery." (There is no knitting in our house - I tried and it didn't take.) Happy Valentine's Day!
3. Night Sky quilt: only two more 10-inch blocks (the center one was January's block), but I finished what will be the top row of the quilt! Next target is to finish the entire second section.
4. Clothing: SM came home one day with costume instructions for the school play, and I had all of a week and a half to figure it out. And we were traveling for 5 of those 10 days. Thanks for the advance notice, School, that you don't have a costume shop and I had to take care of it. She's a "fairy tale peasant," in the chorus of Into the Woods. So I knocked out her peasant top using some white fabric from my quilting pile (I think it used to be a bedsheet) and these directions from Things of Cloth. It only took me a couple of hours, I was surprised but pleased it went that fast. The skirt is in the works, and I also need to make an apron. I'll do pictures of the whole costume together when it's done.
I'm glad that this got me kicked into gear on making clothing - the target is 12 items for the year, and here's two right together.
5. A Doll Like Me doll quilt drive: I committed to 6, and the first one is done. The traveling and the theater costume took cuts in line for my time.
I meant to do T and U for the Alphabet Challenge before going to V for Valentines ... I know what I'm doing for them but other things have obviously taken priority.
For March, it's time to make dresses and skirts for Easter, because it's April 1 this year. I've made Easter outfits only once before. Last summer, my mom found a close-out sale of a fabric store in Idaho and FaceTimed me (in Connecticut) while walking around the store choosing fabric. Best fabric shopping ever! The catch was, you had to buy what was left on the bolt. (I also got major yardage of flannel to use for quilt backs, and the whole load cost me only 50 bucks. And they were coming here on vacation anyway, so we didn't have to ship it!) I ended up with 8 yards of this lightweight cotton that's perfect for skirts and dresses. I'm going to try to use it ALL. I have the Carousel Dress pattern traced off and trimmed for either TA or JK.
2. Valentine's hearts in plastic canvas and yarn: my little girls wanted Valentine's decorations, and one of them found a few random sheets of plastic canvas that have been kicking around for forever. No more. It's all been cut into hearts, and yarn or ribbon looped through them to hang in the windows. TA and JK took turns stitching and we made a bunch of them. JK keeps calling it "knitting" and I keep correcting her to "embroidery." (There is no knitting in our house - I tried and it didn't take.) Happy Valentine's Day!
3. Night Sky quilt: only two more 10-inch blocks (the center one was January's block), but I finished what will be the top row of the quilt! Next target is to finish the entire second section.
4. Clothing: SM came home one day with costume instructions for the school play, and I had all of a week and a half to figure it out. And we were traveling for 5 of those 10 days. Thanks for the advance notice, School, that you don't have a costume shop and I had to take care of it. She's a "fairy tale peasant," in the chorus of Into the Woods. So I knocked out her peasant top using some white fabric from my quilting pile (I think it used to be a bedsheet) and these directions from Things of Cloth. It only took me a couple of hours, I was surprised but pleased it went that fast. The skirt is in the works, and I also need to make an apron. I'll do pictures of the whole costume together when it's done.
I'm glad that this got me kicked into gear on making clothing - the target is 12 items for the year, and here's two right together.
5. A Doll Like Me doll quilt drive: I committed to 6, and the first one is done. The traveling and the theater costume took cuts in line for my time.
I meant to do T and U for the Alphabet Challenge before going to V for Valentines ... I know what I'm doing for them but other things have obviously taken priority.
For March, it's time to make dresses and skirts for Easter, because it's April 1 this year. I've made Easter outfits only once before. Last summer, my mom found a close-out sale of a fabric store in Idaho and FaceTimed me (in Connecticut) while walking around the store choosing fabric. Best fabric shopping ever! The catch was, you had to buy what was left on the bolt. (I also got major yardage of flannel to use for quilt backs, and the whole load cost me only 50 bucks. And they were coming here on vacation anyway, so we didn't have to ship it!) I ended up with 8 yards of this lightweight cotton that's perfect for skirts and dresses. I'm going to try to use it ALL. I have the Carousel Dress pattern traced off and trimmed for either TA or JK.
doll quilt one from TA
It's not a family service project quite yet, but we are underway in the Needle and Foot doll quilt drive for A Doll Like Me! TA started us off.
Photo of the 6-year-old sewing taken by the 5-year-old
6 inch squares - the finish is 18x24 inches
21 February 2018
Doll Quilts
Trina's last post talked about making doll quilts. So I followed the link and read all about it. I had been in the middle of cutting out two new patterns (here and here) but I was inspired and immediately set those aside and started digging in my scrap box.
Throughout the last year I had been cutting out 2.5" squares out of scraps - it helped my scrap bin stay somewhat organized and seeing a nice stack of squares made me happy. I didn't have a particular project for them, just something to save up. But now was the perfect time to use them. Having pre-cut squares sure helped this little quilt come together fast. I already had the backing (leftover from this shirt) and the binding was leftover from a recent project too.
Also found in my scrap box: the leftover pieces from the Woven Star quilt. I also had exactly enough navy for the backing, and one long piece of teal that demanded to be used for the binding. The quilting was the most time consuming part of this project, but was worth it. Maybe someday I'll even get good enough to not have any puckers in the back. At least my binding skills have improved, just between quilt one and quilt two!
Subscribe to:
Posts (Atom)




